Ford Starts Shipping Super Duty Trucks From Retooled Oakville Plant

Ford has begun shipping F-Series Super Duty trucks from its rebuilt Oakville Assembly Complex in Ontario, adding Canadian capacity to a heavy-duty pickup line previously concentrated at plants in Kentucky and Ohio. Ford announced the milestone on November 20, 2026, after completing a transformation it values at nearly C$5 billion.
This is a manufacturing and supply story rather than a new-model reveal. Ford has not announced a separate Oakville-only trim or specification. The company says the additional plant is intended to expand the range of configurations it can build, shorten order waits and provide more flexibility during factory changeovers.
Oakville now builds pickups and chassis cabs
The retooled plant can assemble Super Duty pickups as well as chassis-cab models that outside companies convert into ambulances, utility vehicles and other specialized work trucks. Oakville joins Kentucky Truck Plant and Ohio Assembly in the Super Duty production network, while Ford’s Windsor engine operations supply Canadian-built 7.3-liter “Godzilla” V8 engines.
Ford said the Oakville team received approval to ship trucks two weeks earlier than planned, with initial quality matching the level at Kentucky Truck Plant. That is Ford’s own assessment; Chiefs Review has not inspected or tested the trucks leaving the Ontario line.
More than 2,000 production and skilled-trades employees work at the complex. Ford says the plant includes a new 1,000-foot flat-top assembly line, collaborative robots and AI-assisted cameras used for quality checks as vehicles move through production.
The project adds Ford’s first Canadian stamping operation
The rebuild covered body, paint and final assembly and added Ford’s first stamping facility in Canada. Bringing large aluminum-panel stamping onto the same site reduces the number of major body components that need to be sourced elsewhere, although Ford has not published a detailed local-content percentage for each Oakville-built truck.
The Canadian government says the project can support production of up to 100,000 vehicles a year. Ottawa committed C$464.5 million through its Strategic Response Fund, while the Ontario government is contributing C$464 million. Those figures describe public support for the wider factory project, not the price of any individual truck.
Ford says Oakville-built Super Duty trucks will supply North American dealers and export markets. The company has not provided a country-by-country allocation, production mix or precise ramp-up schedule, so the 100,000-unit figure should be read as maximum planned capacity rather than a confirmed 2027 output forecast.
A capacity decision with a future-powertrain angle
Ford originally announced the Super Duty plan for Oakville in July 2024 as a way to relieve plants operating near capacity. The federal government now says Ford also plans future “multi-energy” Super Duty variants. Neither Ford’s November production release nor the government announcement specifies powertrain type, launch timing or which factory would build those versions, so it would be premature to describe them as confirmed electric or hybrid trucks.
The launch follows other North American factory changes covered by Chiefs Review, including GM Oshawa’s transition toward 2027 heavy-duty Silverado production. Ford is also investing in new propulsion supply chains, including the Michigan-built LFP cells shipped for Fathom electric-truck prototypes. Oakville’s immediate role, however, is straightforward: produce more current-generation Super Duty work trucks while giving Ford another North American assembly and stamping base.
Sources and image credit
- Ford: Oakville transformation and Super Duty shipments, November 20, 2026
- Government of Canada: project funding, employment and capacity details
- Ontario government: provincial support and stamping-facility details
- Featured image: official Ford press photo supplied for editorial use through the linked Ford media release. Photo © Ford Motor Company.